top of page
181-8148_IMG.JPG

The intervention includes (on the basis of what is suggested in the technical geological reports) the construction of support works for the containment and stabilization of road instability phenomena through the creation of stepped walls, reinforced earth, earth retaining walls in reinforced concrete with indirect foundations, "Berlin" piles.

Good consultation

Click on the texts to consult
 

site 6 (38-27)-downstream section_IMG.JPG
6.jpg
23jun06-2.jpg
  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
Letterhead Logo
bottom of page