top of page
20240329_095019.jpg

Design, calculations and construction of bolted steel profile structure for elevator insertion.

The steel "castle" is assembled (not welded) on site, and is connected to the building via steel canopies made with profiles and plates of the same type.

The whole is completed by a roofing structure, ramps and steps on the ground floor for access and transparent glass infill.

Good consultation

Click on the texts to consult
 

IMG_20211102_132510.jpg
Cherubini Tables_Page_1 copy.jpg
20240329_095019.jpg
  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
Letterhead Logo
bottom of page