top of page

if you want background music click inside the box ---------------->
1 square and
2 garages
Construction of a two-story underground garage and creation of a public area at street level
The garages will have two underground levels and will be developed with lane(s) per floor and boxes on the sides or side of the maneuvering lane.
The surface development works aim to redevelop the areas from an architectural and environmental point of view, with the creation of large green spaces, service areas, pedestrian areas etc. and with traffic calming interventions without damaging the usability of existing shops and services.
Good consultation
Click on the texts to consult
bottom of page


